What was tested and what came out

The single, complete results document of the project: dataset, configurations, every table of the analysis, the SR(k) figure, the deviations from the analysis plan, the fidelity review, the limitations, and a guide to what goes in each section of the report. It is written so that the report can be drafted from this file alone. For how the system works, see how_it_works.md. The pre-registered analysis plan is analysis_plan.md (written before any test result was seen); the full statistical tables are in docs/results/.

Where the numbers come from. Every table below is copied verbatim from docs/results/results.md, which docs/results/make_tables.py generates from runs/ (read-only). Nothing here is recomputed. results.md stays the generated source; this file is the version to read. After make_tables.py is re-run, python docs/results/check_explained.py checks that every table and every number here still matches results.md. The LaTeX version of each table is in docs/results/tables.tex, under the label given with each table.

Status labels used below.

  • Planned (confirmatory): a test fixed in analysis_plan.md before test was run; the only results that support claims.
  • Planned (exploratory): listed in the plan as exploratory: uncorrected, no claims.
  • Planned (descriptive): required by the plan, without tests.
  • Supplementary: requested by the team after the plan, descriptive only.
  • Post hoc: a look decided after seeing the results; descriptive only, not in the plan.
  • Integrity check: describes the data, not the method.

Rates are in %, intervals are 95 %.

1. The dataset

data/eval.jsonl holds 45 problems, each with its informal text and its Lean statement:

easy medium hard total
dev (for tuning) 5 5 5 15
test (final runs only) 10 10 10 30
  • Sources: 40 from miniF2F (the Lean 4 port used by DeepSeek-Prover-V1.5) and 5 from PutnamBench (3 of them in test).
  • Areas in test: algebra 13, number theory 13, combinatorics 4 (no easy combinatorics problem: that cell of the 3 × 3 grid is empty).
  • Every statement was checked to compile and reviewed by hand for fidelity to the informal text (data/curation/; see §10). Prompts and settings were tuned only on dev; test was used once, for the final runs.

2. The five configurations

All five run on the same code and graph; only flags in config/ablations/ change.

Name In one line
C1 Baseline A One LLM asked directly for a whole Lean proof; up to 18 independent tries (Lean's errors are not fed back). No agents.
C2 Baseline B One LLM solves the problem in natural language and judges its own answer. No Lean.
C3 No RAG Full system without the lemma search.
C4 No Critic Full system, but one attempt per subgoal and no replanning.
C5 Full system All agents, retries and replanning, up to 40 calls per problem.

All runs used the same model for every role (DeepSeek deepseek-flash, a general-purpose model, not a specialised prover), the same seed (2026), Lean v4.36.0-rc1 and Mathlib 625d891. The exact settings of each run are in its runs/<run>/run_config.json.

3. Runs and data integrity

3.1 Runs used

Integrity check · LaTeX tab:runs. Which run folders feed the analysis and their recorded configuration. C5 and C1 were interrupted and resumed (§11), so each has more than one folder; their pieces are merged into one row per problem. "running" means the run was killed before it could write its final status; "dirty (plan file only)" is a recording artefact explained in §11.

Run Config Profile Seed Split Commit Tree Degraded Run status vs first run
20261103T174646Z_C5_experiment C5 experiment 2026 test ad70ec2 clean False running same
20261103T212359Z_C5_experiment_resume C5 experiment 2026 test ad70ec2 dirty (plan file only) False budget_stop same
20261103T225140Z_C5_experiment_resume2 C5 experiment 2026 test 93bc701 dirty (plan file only) False finished same
20261103T235556Z_C4_experiment C4 experiment 2026 test ea4db4b dirty (plan file only) False finished same
20261104T194056Z_C3_experiment C3 experiment 2026 test 6c61d69 clean False finished same
20261104T232056Z_C2_experiment_check C2 experiment 2026 test 6c61d69 clean False finished same
20261105T131443Z_C1_experiment C1 experiment 2026 test 5ed7507 clean False running same
20261107T200233Z_C1_experiment_resume C1 experiment 2026 test 2c8eae5 dirty (plan file only) False finished same

3.2 Row checks

Integrity check · LaTeX tab:checks. After merging, every configuration has exactly 30 rows (one per test problem), and every row's split, configuration, area and difficulty match the dataset.

Config Rows Status counts lean_down split/config mismatch area/difficulty mismatch
C1 30 budget_exhausted: 7, failed: 3, solved: 20 0 0 0
C2 30 claimed_solved: 30 0 0 0
C3 30 budget_exhausted: 3, failed: 7, solved: 20 0 0 0
C4 30 failed: 16, solved: 14 0 0 0
C5 30 failed: 6, solved: 24 0 0 0

3.3 Infrastructure and error statuses

Planned (plan §5 and §7 item 7) · LaTeX tab:infra. No row ended because of the provider, the spend cap, a bug, or Lean being unavailable, so the plan's re-run rule and sensitivity analysis were never needed. Every failure in this document is a failure of the method itself.

Config provider_error budget_stop error node_error invalid_statement lean_down
C1 0 0 0 0 0 0
C2 0 0 0 0 0 0
C3 0 0 0 0 0 0
C4 0 0 0 0 0 0
C5 0 0 0 0 0 0

4. Main result: verified success

4.1 Success rate (SR)

Planned (primary outcome, plan §2 and §7 item 1) · LaTeX tab:sr. A problem counts as solved only if Lean's kernel accepts the final proof. The full system C5 solved 24/30; C1 and C3 20/30; C4 14/30. C2 never uses Lean, so it has no SR: it appears through how often it claimed success and how often that claim could not be confirmed (FPR_B, §6). The intervals are wide and overlap: that is what 30 problems allow.

Config Solved SR (%) Wilson 95 % CI (%) C2 claimed rate (%) [Wilson] FPR_B (%) [Wilson]
C1 20/30 66.7 [48.8, 80.8] — —
C3 20/30 66.7 [48.8, 80.8] — —
C4 14/30 46.7 [30.2, 63.9] — —
C5 24/30 80.0 [62.7, 90.5] — —
C2 (Baseline B) — — — 30/30 = 100.0 [88.6, 100.0] 11/30 = 36.7 [21.9, 54.5]

Note. C2 is not verified, so it has no SR; it enters only through its claimed rate B⁺/n and FPR_B (plan §7.1). Of the 30 claimed proofs the formal check verified 19 and did not verify 11; 0 left out of FPR_B.

4.2 The three planned comparisons (H1–H3)

Planned (confirmatory, plan §3) · LaTeX tab:mcnemar. Exact McNemar test on the same 30 problems, Bonferroni correction for 3 tests (a comparison is significant only if its adjusted p is below 0.05). b = problems only C5 solved, c = problems only the other configuration solved. ΔSR is the difference in success rate in percentage points, with a paired bootstrap interval.

ID Comparison b c ΔSR (pp) Paired bootstrap 95 % CI (pp) Exact p Bonferroni p Reject at 0.05/3
H1 C5 vs C1 4 0 +13.3 [+3.3, +26.7] 0.1250 0.3750 no
H2 C5 vs C3 5 1 +13.3 [+0.0, +30.0] 0.2188 0.6562 no
H3 C5 vs C4 10 0 +33.3 [+16.7, +50.0] 0.0020 0.0059 yes

Note. n = 30, so power is low: a non-significant result is no evidence of a difference, not evidence of no difference. H2 is Δ_RAG = SR_C5 − SR_C3; H3 is the Critic contribution SR_C5 − SR_C4.

In plain words:

  • H3: the Critic (retry and replan) makes a significant difference. C5 solved 10 problems that C4 did not, and C4 solved none that C5 missed (+33.3 pp, paired bootstrap interval [+16.7, +50.0], Bonferroni p 0.0059).
  • H1 and H2 point in C5's favour but are not significant. C5 vs C1: 4 problems to 0; C5 vs C3: 5 to 1; both +13.3 pp. With 30 problems a difference of 4 or 5 problems is compatible with chance. "Not significant" here means no evidence of a difference, not evidence that there is none: the test has little power at this sample size.

4.3 Exploratory comparisons

Planned (exploratory, plan §3): uncorrected, no claims · LaTeX tab:mcnemar-expl. The other pairs of verified configurations. C1 and C3 solve the same number of problems but not the same problems (3 each way).

ID Comparison b c ΔSR (pp) Exact p (uncorrected)
E1 C3 vs C4 9 3 +20.0 0.1460
E2 C1 vs C3 3 3 +0.0 1.0000
E3 C1 vs C4 8 2 +20.0 0.1094

5. Results by difficulty and area

5.1 Solved per cell of the 3 × 3 grid

Planned (descriptive, plan §4.1) · LaTeX tab:cells. How many problems each configuration solved in each (difficulty, area) cell. Cells have at most 5 problems, so there are no tests and no intervals. For C2 the column counts claimed solutions, not verified ones.

Difficulty Area n C1 C3 C4 C5 C2 (claimed)
easy Algebra 5 5/5 5/5 4/5 5/5 5/5
easy Number theory 5 5/5 4/5 5/5 5/5 5/5
easy Combinatorics 0 — — — — —
medium Algebra 5 4/5 5/5 1/5 5/5 5/5
medium Number theory 4 2/4 2/4 2/4 4/4 4/4
medium Combinatorics 1 0/1 0/1 1/1 1/1 1/1
hard Algebra 3 1/3 2/3 0/3 1/3 3/3
hard Number theory 4 1/4 1/4 0/4 1/4 4/4
hard Combinatorics 3 2/3 1/3 1/3 2/3 3/3

5.2 Success rate by difficulty and by area

Planned (descriptive, plan §4.1) · LaTeX tab:margins (wide table). The margins of the grid: first line solved/n, second line SR % with its Wilson interval. Every verified configuration solves almost all easy problems and 4/10 or fewer hard ones; C5's advantage is on medium problems (10/10). C2 claims every problem, at every difficulty.

Config easy (n = 10) medium (n = 10) hard (n = 10) Algebra (n = 13) Number theory (n = 13) Combinatorics (n = 4)
C1 10/10 6/10 4/10 10/13 8/13 2/4
100.0 [72.2, 100.0] 60.0 [31.3, 83.2] 40.0 [16.8, 68.7] 76.9 [49.7, 91.8] 61.5 [35.5, 82.3] 50.0 [15.0, 85.0]
C3 9/10 7/10 4/10 12/13 7/13 1/4
90.0 [59.6, 98.2] 70.0 [39.7, 89.2] 40.0 [16.8, 68.7] 92.3 [66.7, 98.6] 53.8 [29.1, 76.8] 25.0 [4.6, 69.9]
C4 9/10 4/10 1/10 5/13 7/13 2/4
90.0 [59.6, 98.2] 40.0 [16.8, 68.7] 10.0 [1.8, 40.4] 38.5 [17.7, 64.5] 53.8 [29.1, 76.8] 50.0 [15.0, 85.0]
C5 10/10 10/10 4/10 11/13 10/13 3/4
100.0 [72.2, 100.0] 100.0 [72.2, 100.0] 40.0 [16.8, 68.7] 84.6 [57.8, 95.7] 76.9 [49.7, 91.8] 75.0 [30.1, 95.4]
C2 (claimed) 10/10 10/10 10/10 13/13 13/13 4/4
100.0 [72.2, 100.0] 100.0 [72.2, 100.0] 100.0 [72.2, 100.0] 100.0 [77.2, 100.0] 100.0 [77.2, 100.0] 100.0 [51.0, 100.0]

5.3 The 10 hard problems

Post hoc (not in the analysis plan), descriptive · LaTeX tab:hard. One row per hard problem, 1 = verified solved.

Problem Area C1 C3 C4 C5 Solved by
imo_1964_p1_2 Number theory 1 1 0 1 3
imo_1965_p2 Algebra 1 1 0 1 3
imo_1978_p5 Algebra 0 0 0 0 0
imo_1979_p1 Number theory 0 0 0 0 0
imo_1984_p6 Number theory 0 0 0 0 0
imo_1987_p6 Number theory 0 0 0 0 0
imo_1993_p5 Algebra 0 1 0 0 1
putnam_1964_b2 Combinatorics 1 0 1 1 3
putnam_1965_b2 Combinatorics 1 1 0 1 3
putnam_1995_b1 Combinatorics 0 0 0 0 0
Solved 4/10 4/10 1/10 4/10

Note. Post hoc, descriptive (not in the analysis plan): no tests, no intervals. 1 = verified solved. C1 and C5 solve the same hard problems (4 and 4); 5 hard problems are solved by no configuration (imo_1978_p5, imo_1979_p1, imo_1984_p6, imo_1987_p6, putnam_1995_b1); C3 and C5 solve 4 and 4 hard problems, but only C3 solves imo_1993_p5 and only C5 solves putnam_1964_b2.

Three things stand out. C1 and C5 solve exactly the same 4 hard problems (imo_1964_p1_2, imo_1965_p2, putnam_1964_b2, putnam_1965_b2), so on the hard tier the whole C5 gain over C1 disappears: all 4 problems that C5 solves and C1 does not are medium (§5.5). Five hard problems (imo_1978_p5, imo_1979_p1, imo_1984_p6, imo_1987_p6, putnam_1995_b1) are solved by no configuration. C3 and C5 also solve 4 each but differ by one problem in each direction: only C3 solves imo_1993_p5, only C5 solves putnam_1964_b2. Since C5 has everything C3 has plus retrieval, a hard problem that C3 solves and C5 does not shows how much a single run can vary from one to the next; each configuration was run once, so differences of one problem should not be read as an effect.

5.4 Per-problem outcomes

Data listing (the source of the counts above) · LaTeX tab:per-problem (wide table). One row per test problem: 1 = verified solved; the last column gives C2's claim and whether the Lean check confirmed it.

Problem Difficulty Area C1 C3 C4 C5 C2 (claim, check)
algebra_absapbon1pabsapbleqsumabsaon1pabsa medium Algebra 0 1 0 1 claimed, verified
amc12_2000_p20 medium Algebra 1 1 0 1 claimed, verified
amc12_2001_p9 medium Algebra 1 1 0 1 claimed, verified
amc12a_2008_p15 medium Number theory 0 0 0 1 claimed, not_verified
amc12a_2008_p25 medium Algebra 1 1 0 1 claimed, verified
amc12b_2002_p3 medium Number theory 0 1 1 1 claimed, not_verified
amc12b_2003_p6 medium Algebra 1 1 1 1 claimed, verified
imo_1964_p1_2 hard Number theory 1 1 0 1 claimed, not_verified
imo_1965_p2 hard Algebra 1 1 0 1 claimed, not_verified
imo_1978_p5 hard Algebra 0 0 0 0 claimed, not_verified
imo_1979_p1 hard Number theory 0 0 0 0 claimed, not_verified
imo_1984_p6 hard Number theory 0 0 0 0 claimed, not_verified
imo_1987_p6 hard Number theory 0 0 0 0 claimed, not_verified
imo_1993_p5 hard Algebra 0 1 0 0 claimed, not_verified
mathd_algebra_160 easy Algebra 1 1 1 1 claimed, verified
mathd_algebra_206 easy Algebra 1 1 0 1 claimed, verified
mathd_algebra_234 easy Algebra 1 1 1 1 claimed, verified
mathd_algebra_288 easy Algebra 1 1 1 1 claimed, verified
mathd_algebra_455 easy Algebra 1 1 1 1 claimed, verified
mathd_numbertheory_321 easy Number theory 1 0 1 1 claimed, verified
mathd_numbertheory_328 easy Number theory 1 1 1 1 claimed, verified
mathd_numbertheory_345 easy Number theory 1 1 1 1 claimed, verified
mathd_numbertheory_430 easy Number theory 1 1 1 1 claimed, verified
mathd_numbertheory_64 easy Number theory 1 1 1 1 claimed, verified
numbertheory_3pow2pownm1mod2pownp3eq2pownp2 medium Number theory 1 0 0 1 claimed, verified
numbertheory_notequiv2i2jasqbsqdiv8 medium Number theory 1 1 1 1 claimed, verified
numbertheory_sumkmulnckeqnmul2pownm1 medium Combinatorics 0 0 1 1 claimed, verified
putnam_1964_b2 hard Combinatorics 1 0 1 1 claimed, verified
putnam_1965_b2 hard Combinatorics 1 1 0 1 claimed, not_verified
putnam_1995_b1 hard Combinatorics 0 0 0 0 claimed, not_verified

5.5 Problems solved by one configuration and not the other

Descriptive (discordant pairs of the comparisons; candidates for example traces in the report). For each pair, the problems behind b and c of Tables 2 and 2b, with what C5 did on them (status, LLM calls, replans, and the largest number of attempts on any subgoal of the accepted plan).

  • C5 solved, C4 not (Critic loop): algebra_absapbon1pabsapbleqsumabsaon1pabsa (C5: solved, 24 calls, replans 1, max attempts 1); amc12_2000_p20 (C5: solved, 23 calls, replans 0, max attempts 3); amc12_2001_p9 (C5: solved, 7 calls, replans 0, max attempts 2); amc12a_2008_p15 (C5: solved, 16 calls, replans 0, max attempts 3); amc12a_2008_p25 (C5: solved, 23 calls, replans 0, max attempts 2); imo_1964_p1_2 (C5: solved, 15 calls, replans 0, max attempts 3); imo_1965_p2 (C5: solved, 14 calls, replans 0, max attempts 2); mathd_algebra_206 (C5: solved, 28 calls, replans 0, max attempts 2); numbertheory_3pow2pownm1mod2pownp3eq2pownp2 (C5: solved, 15 calls, replans 0, max attempts 3); putnam_1965_b2 (C5: solved, 17 calls, replans 0, max attempts 3)
  • C4 solved, C5 not: —
  • C5 solved, C3 not (RAG): amc12a_2008_p15 (C5: solved, 16 calls, replans 0, max attempts 3); mathd_numbertheory_321 (C5: solved, 1 calls, replans 0, max attempts 0); numbertheory_3pow2pownm1mod2pownp3eq2pownp2 (C5: solved, 15 calls, replans 0, max attempts 3); numbertheory_sumkmulnckeqnmul2pownm1 (C5: solved, 5 calls, replans 0, max attempts 1); putnam_1964_b2 (C5: solved, 9 calls, replans 0, max attempts 1)
  • C3 solved, C5 not: imo_1993_p5 (C5: failed, 27 calls, replans 1, max attempts -)
  • C5 solved, C1 not: algebra_absapbon1pabsapbleqsumabsaon1pabsa (C5: solved, 24 calls, replans 1, max attempts 1); amc12a_2008_p15 (C5: solved, 16 calls, replans 0, max attempts 3); amc12b_2002_p3 (C5: solved, 9 calls, replans 0, max attempts 1); numbertheory_sumkmulnckeqnmul2pownm1 (C5: solved, 5 calls, replans 0, max attempts 1)
  • C1 solved, C5 not: —
  • C2 claimed, check did not verify: amc12a_2008_p15 (C5: solved, 16 calls, replans 0, max attempts 3); amc12b_2002_p3 (C5: solved, 9 calls, replans 0, max attempts 1); imo_1964_p1_2 (C5: solved, 15 calls, replans 0, max attempts 3); imo_1965_p2 (C5: solved, 14 calls, replans 0, max attempts 2); imo_1978_p5 (C5: failed, 31 calls, replans 1, max attempts -); imo_1979_p1 (C5: failed, 28 calls, replans 1, max attempts -); imo_1984_p6 (C5: failed, 32 calls, replans 1, max attempts -); imo_1987_p6 (C5: failed, 36 calls, replans 1, max attempts -); imo_1993_p5 (C5: failed, 27 calls, replans 1, max attempts -); putnam_1965_b2 (C5: solved, 17 calls, replans 0, max attempts 3); putnam_1995_b1 (C5: failed, 25 calls, replans 1, max attempts -)

6. Baseline B (C2): what the LLM claimed vs what Lean confirmed

Planned (plan §4.2, Eq. 16) · LaTeX tab:fprb. C2 never uses Lean, so it cannot "solve" anything in the verified sense. Instead it reports whether it believes its own proof is correct. To see how often that belief is wrong, each claimed proof was handed to the Lean pipeline (Autoformalizer + Verifier, up to 3 attempts, same lemma search as C5; --check in scripts/run_baseline_b.py).

Quantity Value
Problems 30
Claimed (B⁺) 30
Not claimed 0
Check status among B⁺ not_verified: 11, verified: 19
Verified (Acc on the assembled theorem) 19
Not verified (budget_exhausted included) 11
Left out of FPR_B (provider_error, budget_stop, error, lean_down) 0
FPR_B = not verified / (verified + not verified) 11/30 = 36.7 % [21.9, 54.5]
B⁺ problems for the manual review (§4.2) 10 drawn with random.Random(2026).sample(sorted ids, 10) (listed below)

Note. Manual review set (B⁺ not verified): amc12b_2002_p3, imo_1964_p1_2, imo_1965_p2, imo_1978_p5, imo_1979_p1, imo_1984_p6, imo_1987_p6, imo_1993_p5, putnam_1965_b2, putnam_1995_b1.

By difficulty (counted from Table 11):

easy medium hard total
Claimed correct by the LLM 10 10 10 30
Confirmed by Lean 10 8 1 19

C2 claimed to have solved every problem. Lean confirmed 19; for the other 11 the claim could not be turned into an accepted proof. That is FPR_B = 11/30 = 36.7 % [21.9, 54.5]. Almost all of the gap is on hard problems, where the model was sure of 10 answers and only 1 could be confirmed. This is the main motivation of the project: a confident LLM is not a reliable judge of its own mathematics.

FPR_B is an upper bound on how often C2's self-assessment is wrong: "not confirmed" means "the pipeline could not formalise it within the budget", which does not always mean the informal argument was wrong. Two facts bear on this:

  • For 5 of the 11 (amc12a_2008_p15, amc12b_2002_p3, imo_1964_p1_2, imo_1965_p2, putnam_1965_b2), C5 has a Lean-verified proof of the same statement, so at least the claimed result is true there (whether C2's own argument was sound is a separate question).
  • The plan asks for a manual review of 10 of the 11 (drawn with seed 2026; listed in the note of Table 1b) to separate wrong arguments from formalisation failures. The review sheet is docs/results/fprb_review.md (reviewer: Andrés). Its verdicts are still pending.

7. Efficiency and cost

7.1 Per solved problem

Planned (plan §4.3, RNF-3) · LaTeX tab:eff-solved. Total LLM calls, tokens, cost and wall-clock time of a configuration divided by the problems it solved (failed problems' cost is included in the numerator). Bootstrap intervals in brackets. Nominal cost prices cache hits as fresh calls; it is the figure the plan compares, because the cache makes later runs cheaper for reasons unrelated to the method. Real cost is what the provider charged.

Config Solved Calls / solved k tokens / solved Nominal USD / solved Real USD / solved Wall min / solved
C1 20 12.85 [7.19, 22.60] 219.7 [114.6, 394.7] 0.1285 [0.0668, 0.2313] 0.1235 [0.0643, 0.2218] 17.7 [9.2, 32.0]
C2 (per claimed) 30 2.17 [2.00, 2.40] 5.3 [2.8, 8.6] 0.0027 [0.0013, 0.0047] 0.0027 [0.0013, 0.0047] 0.4 [0.2, 0.7]
C3 20 26.50 [16.15, 43.67] 150.4 [79.3, 274.6] 0.0675 [0.0335, 0.1279] 0.0675 [0.0335, 0.1278] 9.2 [4.6, 17.3]
C4 14 9.43 [5.72, 16.67] 70.7 [38.2, 137.8] 0.0278 [0.0135, 0.0571] 0.0000 [0.0000, 0.0000] 0.2 [0.1, 0.3]
C5 24 16.92 [10.63, 26.21] 148.0 [74.4, 266.4] 0.0566 [0.0245, 0.1097] 0.0490 [0.0236, 0.0897] 7.6 [3.3, 14.6]

Note. C2 has no verified solutions: its ratio uses claimed solutions and excludes the claim check (calls, tokens, cost and wall time up to claim_check_start).

C5 needs fewer calls per solved problem than C3 (16.92 vs 26.50) and costs less per solved problem than C1 (nominal 0.0566 vs 0.1285 USD); C1 also takes the most wall time per solved problem (17.7 min).

7.2 Per problem (means)

Planned (plan §4.3) · LaTeX tab:eff-problem. The same quantities averaged over all 30 problems, solved or not.

Config Calls / problem k tokens / problem Nominal USD / problem Real USD / problem Wall min / problem
C1 8.57 [5.83, 11.33] 146.4 [91.1, 203.5] 0.0857 [0.0532, 0.1192] 0.0823 [0.0505, 0.1152] 11.8 [7.2, 16.5]
C2 2.17 [2.00, 2.40] 5.3 [2.8, 8.6] 0.0027 [0.0013, 0.0047] 0.0027 [0.0013, 0.0047] 0.4 [0.2, 0.7]
C3 17.67 [12.97, 22.37] 100.3 [63.8, 140.8] 0.0450 [0.0269, 0.0658] 0.0450 [0.0269, 0.0658] 6.1 [3.7, 9.0]
C4 4.40 [3.37, 5.43] 33.0 [22.8, 44.4] 0.0130 [0.0081, 0.0186] 0.0000 [0.0000, 0.0000] 0.1 [0.1, 0.1]
C5 13.53 [9.57, 17.60] 118.4 [67.9, 178.7] 0.0453 [0.0225, 0.0737] 0.0392 [0.0218, 0.0588] 6.1 [3.0, 9.7]

7.3 Totals, cache and real cost

Planned (plan §4.3, with the cache and spend-ledger columns added for transparency) · LaTeX tab:totals (wide table). Totals over the kept rows. The last column is the real spend of all the configuration's runs from data/spend_ledger.jsonl, which also includes the attempts discarded when a run was interrupted (C1: 0.0985 USD; C5: 0.1815 USD) and, for C2, the claim check.

Config LLM calls Cached calls Cached (%) Tokens (M) Nominal USD (rows) Real USD (rows) Real USD (ledger, all runs)
C1 257 47 18.3 4.393 2.5700 2.4695 2.5679
C2 65 0 0.0 0.158 0.0814 0.0814 0.7083
C3 530 18 3.4 3.009 1.3508 1.3500 1.3500
C4 132 132 100.0 0.990 0.3887 0.0000 0.0000
C5 406 34 8.4 3.551 1.3590 1.1770 1.3585

Note. C2 claim check (not in the C2 figures of the other columns): 77 calls (11 cached), 0.6274 nominal, 0.6269 real.

RNF-3 (C̄_solved ≤ 20 for C5): C̄_solved = 406/24 = 16.92 calls per solved problem: met.

How to read it:

  • C4 cost 0 USD because every request it made had already been made, word for word, by C5 (C4 is C5 with retries removed, so its first attempts are identical); the answers came from the cache (100.0 % cached calls). For the same reason C4's wall times measure only Lean.
  • RNF-3 (at most 20 LLM calls per solved problem for C5) is met: 406/24 = 16.92.
  • C1 has a budget of 18 calls per problem (the average C5 used on dev, by a rule fixed before test); the full system has 40.
  • Project spend (ledger, all runs, dev included): main experiments 7.3596 USD. Including the exploratory Pro run (1.9407 USD, §14): 9.3003 USD in total; the project cap was raised from 9 to 12.5 USD for that run (§11).

7.4 Medians and quartiles

Supplementary (requested by the team, not in the plan) · LaTeX tab:medians. Means hide that the distributions are very skewed: most problems take few calls and a few take many.

Config Calls, median [Q1, Q3] Wall min, median [Q1, Q3]
C1 4.5 [1.0, 18.0] 2.7 [0.6, 24.2]
C2 2.0 [2.0, 2.0] 0.1 [0.1, 0.3]
C3 16.5 [3.2, 28.0] 3.7 [0.6, 6.7]
C4 5.0 [1.0, 5.8] 0.1 [0.0, 0.1]
C5 11.5 [1.0, 23.8] 2.4 [0.2, 5.2]

7.5 Wall time by difficulty

Supplementary (requested by the team, not in the plan) · LaTeX tab:wall-diff (wide table). Minutes per problem, mean / median [quartiles]. Times are dominated by waiting for the model, and grow with difficulty. C4's times are not comparable (cache, see above). Many easy problems take seconds in C3–C5 because they need no LLM-written subgoal proof at all (Table 8, §9.4).

Config easy (n = 10): mean / median [Q1, Q3] medium (n = 10): mean / median [Q1, Q3] hard (n = 10): mean / median [Q1, Q3]
C1 0.7 / 0.4 [0.1, 1.1] 14.3 / 16.2 [1.8, 23.2] 20.3 / 25.3 [7.0, 32.4]
C2 0.1 / 0.1 [0.1, 0.2] 0.1 / 0.1 [0.1, 0.2] 1.0 / 0.5 [0.2, 1.1]
C3 0.8 / 0.1 [0.0, 1.0] 4.0 / 2.6 [1.2, 6.0] 13.6 / 12.3 [6.6, 19.8]
C4 0.1 / 0.0 [0.0, 0.1] 0.1 / 0.1 [0.0, 0.1] 0.1 / 0.1 [0.1, 0.1]
C5 0.4 / 0.0 [0.0, 0.5] 2.7 / 2.6 [0.7, 4.5] 15.1 / 14.1 [4.0, 21.0]

8. Refinement robustness: SR(k)

Planned (plan §4.4, Eq. 14; figure: plan §7 item 5) · LaTeX tab:srk; figure docs/results/figures/srk_curve.pdf (.png below). SR_C5(k) counts a C5 problem as solved at k if its accepted proof needed at most k attempts on every subgoal. It shows how much each extra attempt (with the Critic's feedback) adds. The last two columns are subgoal-level diagnostics (supplementary).

k SR_C5(k) [Wilson] (%) Δ̂(k) = SR(k) − SR(k−1) (pp) Indep. Δ(k) = p̂(1−p̂)^(k−1) (%) Subgoals solved at attempt k Solved at k / reached k
1 15/30 = 50.0 [33.2, 66.8] +20.0 40.9 18/44 = 40.9 18/44 = 40.9
2 19/30 = 63.3 [45.5, 78.1] +13.3 24.2 8/44 = 18.2 8/26 = 30.8
3 24/30 = 80.0 [62.7, 90.5] +16.7 14.3 5/44 = 11.4 5/18 = 27.8

Note. SR_C5(0) = 9/30 (accepted plan with no LLM subgoal attempt). p̂ = 18/44 = 40.9 %. k = 1 from C4 (no retries, no Critic advice): 14/30 = 46.7 % [30.2, 63.9]. The last two columns are subgoal-level diagnostics (supplementary).

SR(k) of C5 and its marginal gain against the independence curve

Figure: SR(k). (a) SR_C5(k) for k = 0…3 with Wilson intervals: 9/30 solved with no LLM-attempted subgoal, then 15/30, 19/30 and 24/30 as up to 1, 2 and 3 attempts per subgoal are allowed. The square is C4 (one attempt, no retries, no Critic advice): 14/30 = 46.7 %, next to SR_C5(1) = 15/30. (b) The observed gain of each extra attempt, Δ̂(k) (+20.0, +13.3, +16.7 pp), against the gain expected if every attempt succeeded independently with the first-attempt rate p̂ = 18/44 = 40.9 % (40.9, 24.2, 14.3). The independence curve falls quickly; the observed gain does not: the third attempt still adds +16.7 pp, above the 14.3 the independence model predicts. This fits the idea that retries guided by Lean's errors are not just new random draws. Two cautions: the two curves are at different levels (the independence curve is per subgoal, Δ̂(k) per problem; method note 23 in results.md), and with n = 30 each step is a handful of problems.

9. Errors and failure reasons

9.1 Error taxonomy (κ)

Planned (plan §4.5, Eq. 11) · LaTeX tab:kappa (wide table). Every failed attempt classified by the deterministic classifier κ, count (%). Tactic failures and syntax errors dominate. No attempt was classified as misformalization. For C1 the attempts were classified offline with the same κ: 44 of its syntax errors are empty answers, which happen alongside 52 responses cut at the token limit (method note 25 in results.md). For C2 the row is the claim-check loop.

Config Failed attempts syntax missing lemma tactic failure misformalization timeout planning
C1 186 60 (32.3) 50 (26.9) 68 (36.6) 0 (0.0) 8 (4.3) 0 (0.0)
C2 (claim check) 45 14 (31.1) 8 (17.8) 22 (48.9) 0 (0.0) 1 (2.2) 0 (0.0)
C3 82 20 (24.4) 17 (20.7) 42 (51.2) 0 (0.0) 2 (2.4) 1 (1.2)
C4 16 5 (31.2) 4 (25.0) 7 (43.8) 0 (0.0) 0 (0.0) 0 (0.0)
C5 57 19 (33.3) 18 (31.6) 18 (31.6) 0 (0.0) 2 (3.5) 0 (0.0)

Note. C3–C5: classes recorded by the Critic. C1: attempts classified offline with policy.classify (first 3 Lean messages, 300 characters each, as stored; no k_max escalation). C2 has no verified attempts of its own: its row is the claim-check loop.

9.2 Error taxonomy per area

Planned (plan §4.5) · LaTeX tab:kappa-area (wide table). The same counts split by area. Missing-lemma errors are frequent in algebra; tactic failures dominate number theory.

Config Area Failed attempts syntax missing lemma tactic failure misformalization timeout planning
C1 Algebra 77 14 (18.2) 40 (51.9) 22 (28.6) 0 (0.0) 1 (1.3) 0 (0.0)
C1 Number theory 83 27 (32.5) 3 (3.6) 46 (55.4) 0 (0.0) 7 (8.4) 0 (0.0)
C1 Combinatorics 26 19 (73.1) 7 (26.9) 0 (0.0) 0 (0.0) 0 (0.0) 0 (0.0)
C2 (claim check) Algebra 14 5 (35.7) 4 (28.6) 5 (35.7) 0 (0.0) 0 (0.0) 0 (0.0)
C2 (claim check) Number theory 23 5 (21.7) 4 (17.4) 13 (56.5) 0 (0.0) 1 (4.3) 0 (0.0)
C2 (claim check) Combinatorics 8 4 (50.0) 0 (0.0) 4 (50.0) 0 (0.0) 0 (0.0) 0 (0.0)
C3 Algebra 18 3 (16.7) 9 (50.0) 5 (27.8) 0 (0.0) 0 (0.0) 1 (5.6)
C3 Number theory 43 13 (30.2) 3 (7.0) 26 (60.5) 0 (0.0) 1 (2.3) 0 (0.0)
C3 Combinatorics 21 4 (19.0) 5 (23.8) 11 (52.4) 0 (0.0) 1 (4.8) 0 (0.0)
C4 Algebra 8 1 (12.5) 3 (37.5) 4 (50.0) 0 (0.0) 0 (0.0) 0 (0.0)
C4 Number theory 6 2 (33.3) 1 (16.7) 3 (50.0) 0 (0.0) 0 (0.0) 0 (0.0)
C4 Combinatorics 2 2 (100.0) 0 (0.0) 0 (0.0) 0 (0.0) 0 (0.0) 0 (0.0)
C5 Algebra 25 7 (28.0) 8 (32.0) 10 (40.0) 0 (0.0) 0 (0.0) 0 (0.0)
C5 Number theory 24 8 (33.3) 9 (37.5) 6 (25.0) 0 (0.0) 1 (4.2) 0 (0.0)
C5 Combinatorics 8 4 (50.0) 1 (12.5) 2 (25.0) 0 (0.0) 1 (12.5) 0 (0.0)

9.3 Final failure reason per problem

Planned (plan §4.5) · LaTeX tab:final-fail. For every problem a configuration did not solve, its final status and the stage where it stopped (verify = a subgoal proof was rejected; formalize = the Lean sketch could not be assembled). C1 failures are mostly running out of its 18-call budget.

Config Problems status @ stage: count
C1 10 budget_exhausted: 7; failed: 3
C2 30 claimed, check verified: 19; claimed, check not_verified: 11
C3 10 failed @ verify: 5; budget_exhausted @ formalize: 3; failed @ formalize: 2
C4 16 failed @ verify: 11; failed @ formalize: 5
C5 6 failed @ verify: 4; failed @ formalize: 2

9.4 Subgoals closed by fixed tactics vs the LLM

Supplementary (not in the plan) · LaTeX tab:prepass (wide table). Before asking the LLM, the graph configurations try a fixed list of tactics on each subgoal (the pre-pass). This table shows how many subgoals of the accepted plans each closed, and how many solved problems needed no LLM-written subgoal proof at all (8–9 per configuration). This is a shared factor of C3–C5, not something one of them has and the others lack.

Config Pre-pass (accepted plans) LLM (accepted plans) Pre-pass (all subgoal_solved) Solved with no LLM subgoal Solved
C3 7/32 = 21.9 25/32 = 78.1 8/39 = 20.5 8 20
C4 9/18 = 50.0 9/18 = 50.0 11/21 = 52.4 9 14
C5 11/39 = 28.2 28/39 = 71.8 11/42 = 26.2 9 24

10. Fidelity review

Lean checks the formal statement, not the original text, so the statements were reviewed by hand twice.

Before any run (2026-11-01, data/curation/fidelity_review.yaml). Every drawn problem's Lean statement was compared with its informal text. Two were discarded because the formal statement changed the mathematics (imo_1962_p2, imo_1974_p5; replaced). Seven were kept with a note: the formal version differs from the text in a way judged harmless (for example a sequence already reduced to one equation, or a definition written differently).

After the test runs (2026-11-07, team review, post_test_review). As plan §6 requires, every problem solved on test by some configuration that has a note was read again against the informal text: four problems.

Planned (plan §6) · LaTeX tab:fidelity.

Problem Solved by Manual review
amc12b_2003_p6 C1, C3, C4, C5 2026-11-07: counts as solved; report note: The formalization proves that u 0 = +-2/sqrt 3 (a necessary condition), not that -2*sqrt(3)/3 is attained; this is enough to rule out the other options.
mathd_algebra_234 C1, C3, C4, C5 2026-11-07: counts as solved; no note
mathd_algebra_455 C1, C3, C4, C5 2026-11-07: counts as solved; no note
putnam_1965_b2 C1, C3, C5 2026-11-07: counts as solved; no note

In plain words: all four count as solved and no success rate changes, so the plan's "SR with and without" never applies. One needs a caveat in the report: amc12b_2003_p6 (solved by C1, C3, C4, C5 and confirmed for C2) asks which option is a possible first term. The formalisation proves that the first term must be ±2/√3 (a necessary condition), not that −2√3/3 is actually attained; that is enough to rule out the other options. The remaining notes do not apply: imo_2006_p3 is in dev, and imo_1987_p6 and putnam_1995_b1 were solved by no configuration.

11. Deviations from the analysis plan, in plain language

The analysis itself (metrics, tests, corrections) was not changed. What happened differently from the plan was operational, and each item is logged with date and reason in analysis_plan.md (Deviations):

  1. C5 was interrupted (2026-11-03). The machine ran low on memory and the run was killed after 23 of 30 problems. Those 23 rows are kept unchanged. The other 7 were run again with the same frozen configuration, seed and cache, in two resume runs: the first one hit its spend cap during its third problem (that incomplete row of imo_1984_p6 is discarded), the second finished the rest. The merge rule (which row comes from which run) was written down before the analysis and the analysis script checks it.
  2. C4 ran before C3 (plan order: C5, C3, C4, C2, C1). For schedule and cost reasons only. Every configuration still ran once on the same problems, so the paired comparisons are not affected.
  3. The per-run spend cap was raised twice for the main runs (to 2 USD before C3, then to 3.5 USD before C1), by team decision, so that those runs would not stop half-way. The cap only decides whether a request is sent; it does not change prompts, models, call budgets or results. For the exploratory Pro run (§14, after all main runs) both caps were raised again: the project cap from 9 to 12.5 USD and the per-run cap from 3.5 to 5 USD.
  4. C1 was stopped by the team (2026-11-05) to free the machine, after 23 of 30 problems. The other 7 were completed on 2026-11-07 in a resume run with the same procedure as C5, and the pieces were merged into one file (checked row by row).
  5. dirty: true in four run_config.json files (found during the analysis). The run configuration file was rewritten at the end of each run and read the git state at that moment; the only changed file was analysis_plan.md itself, edited during the runs to log these incidents. Every tree was clean at launch. The recording was fixed after the test runs.
  6. The exploratory Pro run was stopped by the team (2026-11-08) after 5 of its 10 problems and not resumed (§14). It is outside the analysis plan's results and changes none of them.

Written before any test run, as a clarification rather than a deviation: how the C2 claim check works (plan §4.2): each claimed proof becomes a sketch for the Autoformalizer, with up to 3 attempts and Lean feedback, the same lemma search as C5, no Planner and no fixed tactics; its calls are counted apart from C2's own.

Where the plan was silent or had to be read literally (full list: "Method notes" at the end of results.md):

  • C2 has no verified SR, so Table 1 reports its claimed rate and FPR_B instead, and C2 is in no McNemar test. In the grid tables C2 shows claimed counts, labelled as such.
  • The plan fixes the bootstrap (10 000 resamples, seed 2026) but not the random generator; NumPy's default generator was used, the same for every comparison.
  • The plan says "10 drawn with seed 2026" for the C2 manual review without saying how; Python's random.Random(2026).sample on the sorted ids was used.
  • SR(0) and the first-attempt rate p̂ of the SR(k) analysis are not defined in the plan; the definitions used are in method notes 22 and 23.
  • C1 attempts were classified by κ offline from the stored (shortened) Lean messages.
  • Tables 4d, 5, 8 and 11b were added after the plan; they are descriptive and labelled.
  • Disclosure: while checking configurations, before the analysis script existed, the analyst had seen the first C5 test row and run summaries of C5 and C4. After the first test run the script changed only in how C2's wall time is cut, an added note on truncated responses, and LaTeX layout. No test, comparison, correction or metric changed.

12. Limitations

  • Small sample. 30 test problems (10 per difficulty, only 4 in combinatorics). Confidence intervals are wide, H1 and H2 have little power, and per-area numbers are descriptive only.
  • One run per configuration. Each configuration ran once with one seed, so pass@k is estimated only for k = 1 (the SR). LLM output varies between runs; differences of one or two problems (for example C3 vs C5 on hard problems, §5.3) are within that variation.
  • One general-purpose model. Every role used the same general model (deepseek-flash), not a model trained for Lean. Results may differ with other models. deepseek-flash is an alias with no versioned id; the run configs record what was used.
  • Possible contamination. miniF2F and the competition problems are public, and Lean proofs of many miniF2F problems are online. The model may have seen some of them in training, which would make every configuration look better than it would on new problems. This affects all configurations, but not necessarily equally (C1 asks for a Lean proof directly, which is where a memorised proof might help most).
  • Formal vs informal statement. Lean checks the formal statement, not the original text. All statements were reviewed (§10); amc12b_2003_p6 needs the caveat above.
  • FPR_B is an upper bound and its manual review is still pending (§6).
  • Shared tactic pre-pass. 8–9 solved problems per graph configuration need no LLM-written subgoal proof (Table 8), which narrows the room in which RAG and the Critic can differ.
  • Truncated responses. Some LLM answers hit the token limit (C1 most often: 52 responses in 9 rows); in C1 these show up as empty attempts counted against its budget.
  • Interrupted runs. C5 and C1 were stopped by operational incidents and resumed with the same frozen configuration (§11).
  • C4's cost and times come from C5's cache and are not comparable at real cost; nominal cost is the comparable figure.

13. For the report

What to use in each section of the report, with the LaTeX label of each table in docs/results/tables.tex (\input the file or copy the tables; it needs only booktabs; tables marked "wide" are table*). The figure is docs/results/figures/srk_curve.pdf. Keep the status label of each table in its caption or text: post hoc and supplementary tables must say so.

Results

What Table (this file) LaTeX label Status
Verified SR with Wilson CI; C2 claimed rate and FPR_B Table 1 (§4.1) tab:sr Planned
H1–H3: b, c, ΔSR, bootstrap CI, exact and Bonferroni p Table 2 (§4.2) tab:mcnemar Planned (confirmatory)
Exploratory pairs Table 2b (§4.3) tab:mcnemar-expl Planned (exploratory)
Per-cell grid and margins Tables 3, 3b (§5.1–5.2) tab:cells, tab:margins Planned (descriptive)
Baseline B claim check Table 1b (§6) tab:fprb Planned
Efficiency, RNF-3 Tables 4, 4b, 4c (§7.1–7.3) tab:eff-solved, tab:eff-problem, tab:totals Planned
SR(k) and the independence curve Table 6 + figure (§8) tab:srk, srk_curve.pdf Planned
κ taxonomy and final failure reasons Tables 7, 7b, 7c (§9.1–9.3) tab:kappa, tab:kappa-area, tab:final-fail Planned
Infrastructure statuses and fidelity review Tables 9, 10 (§3.3, §10) tab:infra, tab:fidelity Planned
Appendix / supplementary material Runs used, Row checks, Tables 4d, 5, 8, 11, 11b tab:runs, tab:checks, tab:medians, tab:wall-diff, tab:prepass, tab:per-problem, tab:hard Integrity / supplementary / post hoc

Points to state:

  • C5 solves 24/30 (80.0 %, [62.7, 90.5]); C1 and C3 20/30; C4 14/30 (Table 1).
  • Only H3 (Critic) is significant: +33.3 pp, Bonferroni p 0.0059. H1 and H2 (+13.3 pp each) are not; report them as "no evidence of a difference", never "no difference" (Table 2).
  • FPR_B = 11/30 = 36.7 % [21.9, 54.5], an upper bound (Table 1b).
  • RNF-3 is met: 16.92 calls per solved problem for C5 (Table 4c).
  • No provider errors, spend stops, Lean outages or degraded runs (Table 9); all four fidelity reviews count as solved, with the amc12b_2003_p6 note (Table 10).

Discussion

  • The Critic loop is what matters most (H3, and the SR(k) figure: each extra attempt keeps adding solved problems, more than an independent-retry model predicts at k = 3; §8, with the two cautions given there).
  • C5's gain over C1 is entirely on medium problems (C5 10/10, C1 6/10; Table 3b). On hard problems C1 and C5 solve the same 4 (Table 11b, post hoc), and 5 hard problems are solved by no configuration: hard olympiad problems remain out of reach for this setup.
  • RAG: C5 vs C3 favours C5 (5 to 1) but is not significant; the only problem C3 solves and C5 does not is a hard one, an example of run-to-run variation (§5.3).
  • Self-assessment is unreliable: C2 claims 30/30; Lean confirms 19, and only 1 of the 10 hard claims (§6). For 5 of the 11 unconfirmed claims C5 proves the statement, which is why FPR_B is an upper bound; cite the manual review once it is done.
  • Cost: C5 is cheaper per solved problem than C1 at nominal cost (Table 4); C3, without lemma suggestions, needs the most calls per solved problem.
  • Errors: tactic failures and syntax errors dominate; misformalization never appears; missing lemmas are common in algebra (Tables 7, 7b). C1's failures are mostly budget exhaustion, partly driven by truncated responses (Table 7c, §9.1).
  • Optional illustrative traces for an appendix are listed at the end of results.md ("Illustrative traces"; candidates in §5.5).

Limitations

Use §12. Essential: small n and low power; one run and one seed (pass@1 only); one general-purpose model with an unversioned alias; possible contamination of public benchmarks; FPR_B upper bound with the manual review pending; the formal-vs-informal caveat of amc12b_2003_p6; the shared pre-pass; the interrupted and resumed runs and the other deviations of §11 (the plan requires reporting them as deviations).

Ethics

  • Trust in AI-generated mathematics: the central finding of Baseline B (§6) is that the model's confidence is not evidence of correctness; the system accepts a proof only when the Lean kernel does, and the report should say that LLM output should not be trusted without formal or human verification.
  • Data: only public benchmarks (miniF2F, PutnamBench) were used, with no personal data; cite their sources and licences, and mention the contamination risk (§12).
  • Cost and resources: Main experiments (dev + test, C1–C5): 7.36 USD. Including the exploratory Pro run: 9.30 USD in total; the project cap was raised from 9 to 12.5 USD for that run (see Deviations). A response cache avoided repeated calls; this keeps the work reproducible on a student budget.
  • Transparency and reproducibility: the analysis plan was written before the test runs, every deviation is logged (§11), post hoc analyses are labelled, and each run records its models, seed and Lean/Mathlib versions.

14. Exploratory: a stronger model on the hard problems

Post hoc (decided 2026-11-08, after all confirmatory runs), descriptive · LaTeX tab:pro-hard. This section changes no result of §4–§12. It is logged in analysis_plan.md ("Exploratory analysis (post hoc, decided 2026-11-08)" and two Deviations entries of that date).

Why. On the hard tier the agents add nothing with DeepSeek-Flash: C1 and C5 solve exactly the same 4 hard problems (§5.3). That suggests the hard problems are limited by the model, not by the method. To look at that, C5 was run again on the 10 hard test problems with a stronger model, DeepSeek-V4-Pro, in every role (profile experiment_pro); everything else (graph, prompts, budgets, seed) was the frozen C5 configuration.

What happened to the run. The team stopped it after 5 of the 10 problems (20261108T130803Z_C5_experiment_pro_pro_hard) and it was not resumed. Three outcomes are not failures of Pro and are left out of its solved count:

  • imo_1978_p5: provider_error (connection drop, not a system failure). The 30th call of the problem (the Autoformalizer on subgoal 1) never reached DeepSeek: all 5 transport attempts got APIConnectionError: Connection error. with no HTTP response (15:34:50–15:37:28 UTC). The next problem connected normally.
  • imo_1984_p6: interrupted, cut mid-problem by the stop (4 paid calls, no row).
  • imo_1964_p1_2, putnam_1964_b2, putnam_1995_b1, putnam_1965_b2: not attempted.

Only the 4 problems that both runs finished are compared (imo_1965_p2, imo_1979_p1, imo_1987_p6, imo_1993_p5).

Table 12. Exploratory: C5-Flash vs C5-Pro on the hard problems (post hoc, descriptive, not in the analysis plan)

Problem Flash solved Flash calls Flash USD Flash min Pro outcome Pro solved Pro calls Pro USD Pro min
imo_1964_p1_2 1 15 0.0261 3.4 not attempted — — — —
imo_1965_p2 1 14 0.0312 3.7 failed 0 30 0.3608 33.6
imo_1978_p5 0 31 0.1347 39.6 provider_error (connection drop, not a system failure) — 30 0.2938 40.7
imo_1979_p1 0 28 0.1463 19.7 failed 0 24 0.2722 29.3
imo_1984_p6 0 32 0.3366 27.6 interrupted — — — —
imo_1987_p6 0 36 0.1793 21.4 budget_exhausted 0 40 0.4607 57.4
imo_1993_p5 0 27 0.0790 10.6 failed 0 24 0.3807 53.6
putnam_1964_b2 1 9 0.0160 2.3 not attempted — — — —
putnam_1965_b2 1 17 0.0409 4.9 not attempted — — — —
putnam_1995_b1 0 25 0.1268 17.5 not attempted — — — —
Both finished (4) 1/4 105 0.4357 55.5 0/4 118 1.4744 173.9
All hard (10) 4/10 234 1.1169 150.9 — — — —

Note. Post hoc, exploratory (decided 2026-11-08, after all confirmatory runs): descriptive only, no tests, no intervals; it changes no main result. C5-Flash = the kept C5 rows of the main test result; C5-Pro = run 20261108T130803Z_C5_experiment_pro_pro_hard (profile experiment_pro: deepseek-v4-pro in every role, everything else as frozen), stopped by the team and not resumed. Cost is nominal USD (cache hits priced as fresh calls). provider_error, interrupted and not attempted do not count as failures of Pro and are left out of its solved count; only problems both runs finished are compared. imo_1984_p6 was interrupted after 4 paid calls (0.1725 USD real, 18.1 min) and left no row. Real cost of the Pro run: 1.9407 USD (151 paid calls, all in the ledger); project ledger total: 9.3003 USD.

In plain words: on the 4 problems both runs finished, Pro solved none and Flash solved one (imo_1965_p2, which Pro failed after 30 calls). Pro spent about 3.4 times as much (1.47 vs 0.44 USD nominal) and took about 3.1 times as long (174 vs 56 min) on those 4. This does not show that a stronger model fails to help: only 4 of the 10 problems were compared, each model ran once, and 3 of the 4 hard problems Flash solved were never attempted by Pro. The question of whether the hard tier is limited by the model stays open; the report can mention the run as an exploratory, incomplete check and should not draw a conclusion from it.

Cost. The Pro run cost 1.9407 USD real (151 paid calls, all off-peak). With it, the project ledger stands at 9.3003 USD; for this run the caps were raised to 12.5 USD in total and 5 USD per run (Deviations, 2026-11-08).